Terms & Conditions
The terms that apply to every hire of our equipment.
CRAFTSMAN ELECTRICAL LIMITED
EQUIPMENT HIRE AGREEMENT & TERMS OF TRADE (2026)
Trading as A1 Digger Hire
1. PARTIES
1.1 Owner
This Agreement is made between:
Craftsman Electrical Limited
Trading as A1 Digger Hire
Address: 260 Pukekowhai Drive, Cromwell, New Zealand
Phone: 021 063 6665
Email: A1diggerhire.nz@gmail.com
GST Number: 138-786-064
(“Owner”, “We”, “Us”, “A1 Digger Hire”)
1.2 Hirer
The person, company, trust, or entity completing the booking or taking possession of Equipment (“Hirer”, “You”).
2. ACCEPTANCE & FORMATION OF AGREEMENT
2.1 Acceptance
This Agreement is accepted when the Hirer:
(a) Completes an online booking;
(b) Ticks acceptance of terms on the website;
(c) Signs digitally or physically;
(d) Takes possession of Equipment.
2.2 Legal Effect
Electronic acceptance constitutes a legally binding agreement equivalent to a handwritten signature.
2.3 Authority
The Hirer warrants that:
(a) They have authority to enter into this Agreement;
(b) They accept all terms in full;
(c) They are responsible for all obligations herein.
3. DEFINITIONS
3.1 “Equipment” means all machinery, diggers, attachments, trailers, and accessories supplied.
3.2 “Hire Period” means the period from dispatch until return, inspection, and acceptance.
3.3 “Hire Charges” includes all hire fees, excess hours, cleaning, fuel, damage, transport, and recovery costs.
3.4 “Working Hours Limit” means:
(a) Half Day: 4 machine hours
(b) Full Day: 6 machine hours
3.5 “Loss of Use” means loss of income while Equipment is unavailable.
3.6 “A1 Digger Hire” means the trading name used by Craftsman Electrical Limited for equipment hire services.
4. HIRE BASIS
4.1 Equipment is supplied on a dry hire basis unless otherwise agreed.
4.2 The Hirer assumes full responsibility for:
(a) Operation
(b) Safety
(c) Site conditions
(d) Legal compliance
4.3 The Hirer warrants all operators are competent and experienced.
5. HIRE PERIOD
5.1 Hire begins when Equipment leaves the Owner’s possession.
5.2 Hire ends only when:
(a) Equipment is returned
(b) Inspected
(c) Accepted by the Owner
5.3 Charges continue until all conditions are met.
5.4 Late returns incur full additional hire charges.
6. HIRE CHARGES
6.1 The Hirer agrees to pay all charges as displayed at booking.
6.2 Additional charges apply for:
(a) Excess machine hours
(b) Late return
(c) Cleaning
(d) Fuel
(e) Damage
(f) Transport
(g) Recovery
6.3 Return Condition Standard
Equipment must be returned:
(a) Clean and free of soil, mud, clay, sand, gravel, concrete, cement, mortar, render, grout, plaster, paint, tar, bitumen, sealant, foam, resin, sap, manure, and any other site or building material;
(b) With the undercarriage, tracks, track frames, sprockets, idlers, rollers, bucket, bucket teeth, cutting edge, quick-hitch, hydraulic rams, hoses, steps, guards, and all cavities free of compacted, caked, or hardened material;
(c) With fuel at the level supplied, or as otherwise agreed in writing;
(d) With all attachments, pins, keys, manuals, and accessories supplied;
(e) In the same condition as supplied, fair wear and tear excepted; and
(f) Free of any hazardous substance, asbestos, contaminated soil, or other regulated material.
6.4 Cleaning, Decontamination & Restoration Charges
Where Equipment is not returned to the standard in clause 6.3, the Owner may:
(a) Carry out the necessary cleaning, decontamination, or restoration and charge the Hirer for it;
(b) Engage a third-party cleaning or specialist contractor and pass on the full cost; and
(c) Charge for the labour time, equipment, products, water, and disposal costs involved.
Cleaning is charged at $95.00 per hour plus GST as set out in clause 27.1. Charges under this clause are in addition to hire charges and are not limited to any bond, deposit, pre-authorisation, or Damage Waiver excess.
7. PAYMENT TERMS
7.1 Payment is required upfront unless an account is approved.
7.2 A bond may be required.
7.3 Interest on overdue amounts:
3% per month, compounded monthly
7.4 The Hirer is liable for all recovery and legal costs.
8. CONDITION & ACCEPTANCE
8.1 Equipment is supplied in good working condition.
8.2 The Hirer must inspect before use.
8.3 Use of Equipment confirms acceptance.
8.4 Condition Records
The Owner may record the condition of the Equipment by photograph, video, hour meter reading, fuel gauge, or written report at dispatch and on return. Those records are evidence of the condition of the Equipment at the relevant time.
9. USE OF EQUIPMENT
The Hirer must:
(a) Use Equipment correctly
(b) Operate safely
(c) Follow all instructions
The Hirer must NOT:
(d) Misuse or overload
(e) Allow unauthorised use
(f) Sub-hire
(g) Modify Equipment
10. HIRER RESPONSIBILITIES
10.1 The Hirer is responsible for:
(a) Site conditions
(b) Ground conditions
(c) Underground services
(d) Safety compliance
(e) All damage caused
11. DAMAGE, LOSS & THEFT
11.1 The Hirer is liable for all damage, loss, or theft.
11.2 Includes:
(a) Accidental damage
(b) Negligence
(c) Theft
11.3 The Owner may recover:
(a) Repair costs
(b) Replacement costs
(c) Transport
(d) Loss of Use
11.4 Physical Damage — Specific Components
Without limiting clauses 11.1 to 11.3, the Hirer is liable for the cost of repairing or replacing damage to:
(a) Tracks, track frames, rollers, idlers, sprockets, and final drives;
(b) Bucket, bucket teeth, cutting edges, side cutters, ripper tynes, augers, and all attachments;
(c) Hydraulic rams, cylinders, seals, hoses, fittings, and hydraulic contamination;
(d) Boom, dipper arm, quick-hitch, pins, bushes, and linkage;
(e) Engine, cooling system, radiator, exhaust, and turbo;
(f) Panels, bonnet, doors, glass, mirrors, lights, beacons, wipers, and safety decals;
(g) Seat, controls, joysticks, gauges, display screens, wiring, and battery;
(h) Fuel and oil tanks, fuel lines, filters, and injectors;
(i) Trailer, ramps, tie-down points, and towing equipment; and
(j) Any other component damaged by impact, overloading, overheating, contamination, or misuse.
11.5 Concrete, Cement & Hardened Material
Concrete, cement, mortar, render, grout, plaster, resin, expanding foam, tar, or bitumen that has been mixed, poured, carried, or allowed to set on or in the Equipment is treated as damage, and not as ordinary cleaning, where its removal requires chipping, grinding, chemical treatment, abrasive blasting, or dismantling.
The Hirer is liable for all removal costs and for any resulting damage to paintwork, seals, hoses, rams, bearings, pins, or other components, together with the Owner's loss of use.
11.6 Loss of Use
Where Equipment is unavailable for hire while it is cleaned, assessed, repaired, or awaiting parts, the Owner may charge loss of use at the standard daily hire rate for that Equipment for each day, or part day, it is unavailable.
11.7 Assessment, Quotations & Repairs
(a) The Owner may obtain an independent assessment or quotation, and the Hirer is liable for its reasonable cost.
(b) The Owner is not required to obtain the Hirer's approval before carrying out repairs necessary for safety or to prevent further damage.
(c) The Hirer must not arrange or authorise repairs to the Equipment without the Owner's written consent.
12. INSURANCE
12.1 The Hirer is responsible for insuring Equipment unless a Damage Waiver is purchased.
13. DAMAGE WAIVER
13.1 General
(a) The Hirer may elect to purchase a Damage Waiver.
(b) The Damage Waiver is optional.
(c) The Damage Waiver is not insurance.
13.2 Effect
Where purchased, the Owner agrees to limit recovery of:
(a) Accidental damage
(b) Theft
(c) Transport
(d) Loss of Use
(e) Admin costs
13.3 Excess
The Hirer remains liable for the excess per incident.
13.4 Conditions
Applies only if:
(a) Equipment used correctly
(b) No breach occurs
(c) Incident reported immediately
13.5 Exclusions
Does NOT cover:
(a) Misuse
(b) Unqualified operators
(c) Underground damage
(d) Water damage
(e) Unsecured theft
(f) Transport damage
13.6 No Waiver
If not selected, Hirer is liable for ALL costs.
14. DELIVERY & COLLECTION
14.1 The Hirer must provide safe access.
14.2 The Owner may enter site for delivery or recovery.
15. REPOSSESSION
15.1 The Owner may repossess without notice if:
(a) Payment overdue
(b) Terms breached
(c) Equipment at risk
16. OWNERSHIP
All Equipment remains property of Craftsman Electrical Limited.
17. PPSA
17.1 Security interest is granted under the Personal Property Securities Act 1999.
18. CANCELLATION
18.1 Deposits may be non-refundable.
18.2 The Owner may cancel at any time.
19. LIABILITY & INDEMNITY
19.1 The Owner is not liable for:
(a) Loss of profit
(b) Delays
(c) Indirect losses
19.2 The Hirer indemnifies the Owner against all claims.
20. CONSUMER LAW
20.1 Rights under NZ law apply.
20.2 For business hires, CGA is contracted out of where permitted.
21. PRIVACY
21.1 Information may be collected and shared for credit purposes.
22. DISPUTES
22.1 Disputes resolved by:
(a) Negotiation
(b) Mediation
(c) Arbitration
23. GENERAL
23.1 NZ law applies.
23.2 Invalid clauses do not affect the remainder.
24. WEBSITE INTEGRATION
24.1 Booking selections form part of this Agreement.
24.2 Pricing, waiver, and excess displayed online are binding.
25. SPECIFIC HIRE RISKS
25.1 Fuel, Oils & Fluids
The Hirer must use the correct fuel and fluids specified for the Equipment and must not:
(a) Use contaminated, watered, or incorrect fuel;
(b) Introduce AdBlue, diesel exhaust fluid, petrol, or any additive into the diesel system;
(c) Allow the Equipment to run dry of fuel, engine oil, hydraulic oil, or coolant; or
(d) Top up with incorrect oil grades or incompatible fluids.
The Hirer is liable for all costs of draining, flushing, replacing filters and fluids, and repairing any resulting component damage, together with loss of use.
25.2 Water, Mud & Submersion
The Hirer is liable for all damage arising from operation in water, mud, silt, sand, or flood conditions, including damage to the engine, electrical system, bearings, seals, and hydraulic system, and for all costs of recovery, drying out, and repair.
25.3 Overloading & Exceeding Capacity
The Hirer must not exceed the rated capacity, lifting limits, or manufacturer's specifications of the Equipment or any attachment. The Hirer is liable for all damage, including structural damage, hydraulic failure, and component breakage, arising from overloading or exceeding rated capacity.
25.4 Overturning, Impact & Rollover
The Hirer is liable for all damage arising from rollover, tip-over, collision, impact with structures or vehicles, dropped loads, or striking fixed objects, including damage to safety structures, canopies, and ROPS/FOPS frames.
25.5 Keys, Security & Unattended Equipment
The Hirer must keep the Equipment secure and attended where practicable, must not leave keys in the Equipment, and must report any theft, attempted theft, or vandalism to the Owner and the Police immediately. The Hirer is liable for loss or damage caused by failing to secure the Equipment.
25.6 Vandalism, Graffiti & Third-Party Interference
The Hirer is liable for all damage caused by vandalism, graffiti, arson, or interference by third parties while the Equipment is in the Hirer's possession.
25.7 Modifications & Unauthorised Repairs
The Hirer must not modify, weld, drill, paint, or alter the Equipment, or engage any person to service or repair it, without the Owner's prior written consent. The Hirer is liable for all costs of reversing any unauthorised modification.
25.8 Continuing to Operate
The Hirer must stop operating the Equipment immediately if a warning light, alarm, or fault develops, if it is damaged, or if it becomes unsafe. The Hirer is liable for any additional damage caused by continuing to operate Equipment in that state.
26. HAZARDOUS MATERIALS & BIOSECURITY
26.1 Asbestos & Contaminated Soil
The Hirer must not use the Equipment on, or allow it to come into contact with, asbestos, asbestos-containing material, contaminated soil, or any other regulated or hazardous material without the Owner's prior written consent. Where contamination occurs, the Hirer is liable for all decontamination, testing, disposal, and compliance costs, and for any resulting loss of use.
26.2 Hazardous Substances
The Hirer is liable for all costs arising from the Equipment being used to carry, mix, or store hazardous substances, chemicals, or noxious liquids.
26.3 Biosecurity & Noxious Weeds
The Hirer must comply with all biosecurity requirements relating to the movement of soil and plant material, and must ensure the Equipment is free of soil, seed, and plant material from a controlled or restricted area before it is returned or moved between sites. The Hirer is liable for all cleaning, inspection, and compliance costs arising from a breach of this clause.
27. CHARGE SCHEDULE & RECOVERY
27.1 Cleaning charges are $95.00 per hour plus GST, covering labour, equipment, products, and water used in cleaning the Equipment.
27.2 Specialist removal and repair work, including removal of concrete, cement, mortar, render, grout, resin, foam, tar, or bitumen, abrasive blasting, chemical treatment, decontamination, and panel or component repair, is charged at the Owner's current standard rates, which are available on request and form part of this Agreement.
27.3 Where no standard rate applies, charges are the Owner's actual cost, including third-party invoices, parts, labour, transport, testing, and disposal, plus a reasonable administration fee.
27.4 The Owner may apply any bond, deposit, pre-authorisation, or card on file toward any amount owing under this Agreement, and the Hirer remains liable for any shortfall.
27.5 Amounts owing are a debt due and may be recovered in accordance with clauses 7.3 and 7.4.
28. DIGITAL SIGNATURE
By proceeding with booking:
✔ Hirer accepts all terms
✔ Accepts full responsibility
✔ Confirms authority
Craftsman Electrical Limited
Trading as A1 Digger Hire